Group Raises Alarm over Safety of Rig at OML 83, 85 in Bayelsa

By Amos Okioma, Yenagoa

A  Niger Delta group, the Ifalibobou Revolutionary Movement (IRM) has expressed safety concerns over the state of an oil rig deployed to oilfields at Koluama coastal communities in Bayelsa.

The group issued an ultimatum to First Exploration and Petroleum Development Company (First E&P) to clarify the safety records of the rig within 72 hours to avoid a repeat of the 2012 rig disaster in the area.

It demanded that failure to show proof of integrity of the facility, the rig should leave the territorial waters of Southern Ijaw and Brass Local Government Areas of Bayelsa.

First E&P, an indigenous oil firm, in 2015 acquired Oil Mining Lease (OML) 83 and OML 85 oilfields when Chevron Nigeria Limited (CNL) divested its 40 per cent interests in the oil blocs, to become its operator.

A rig blow out in January 2012 at Chevron’s oilfield in the area resulted to a fire that burnt out the KS Endeavor rig in 48 days.

The affected coastal are Koluama 1&2, Ekeni, Foropa, Fish Town, Ezetu and Sangana, (KEFFES)

The leader of IRM, Joseph Sese in a statement in Yenagoa expressed sadness that the company began operations in the area without taking cognizance of the negative impact their operations would have on the host communities.

 “We express our deepest concern over the sudden appearance of an oil drilling rig contracted by First Exploration and Petroleum Development Company in the Territorial waters of KEFFES host communities in Southern Ijaw and Brass Local Government Areas of Bayelsa State.

 “As aboriginal indigenes of the coast line and territorial watch dogs we are highly vexed by the manner of your voyage for oil exploratory activities in our offshore waters without any show of the integrity of the rig to the community.

“As the incident of 16th January, 2012 is still fresh in our memory, except you jack-up your rig and leave our region within seventy two hours (72hrs) for the safety of your workers and equipment.

 “We sincerely don’t want a repeat of the disastrous gas exploration that caused severe damage to our marine environment and the entire ecosystem of the KEFFES region.

 “The way and manner your rig appeared in our territory is a sad remembrance of the way and manner the Rig, K.S. Endeavor came into our coast in an oil exploratory activities without an EIA report and contingency plan as required by law. 

“The end of it was a colossal damage to human and environmental elements.

 “It is imperative to state that your drilling operation will generate severe environmental impact such as air and water pollution, climate change, over exploitation of the marine ecosystem.

 “It will yield major ecological and environmental stresses with irreversible loss of species, destruction of habitat and climate catastrophes.

 “Your activities will impact not only the states and dynamics of natural resources and ecosystem but also alter human health, wellbeing, welfare and economic wealth since these resources are support fortunes to the human lives in the area,” the statement read in part.

According to the statement, the oil rig is stationed to drill the Ayala oil field, (OML83) with a potential reserve of 200 million barrels of oil equivalent.

Also, Madu oil field, (OML85), with potential of 140 million barrels of oil equivalent, including 45 percent gas deposits.

In a reaction, Mr Mathew Sele-Epri, chairman KEFFES Rural Development Foundation described the threats as baseless and a ploy to seek attention adding that the community leadership was in a transparent relationship with First E&P.

Sele-Epri said that the allegations by Sese as false and unfounded as the company had established a mutually beneficial relationship with the KEFFES communities for over three years.

 “These allegations are completely false because First Exploration and Production has an existing relationship with KEFFES Rural Development Foundation which I am privileged to lead.

 “We signed a Global Memorandum of Understanding (GMoU) in August 2018 are it is being implemented, it is also false that the community is not aware of the deployment of the rig, the community was duly informed before the rig arrived.

 “We negotiated and got 18 employment slots for the communities and three people from Foropa where Sese hails from are currently working on the rig and the allegation on the safety of the rig is spurious.

 “There is no form of doubt on the integrity of the rig because the company has been working with the regulators through the stages of the field development and we believe the regulators have the expertise to police the industry.  “The claims on EIA is also untrue, we in the community fully participated in the EIA conducted by Chevron before the divestment and when First E&P took over they have done some baseline studies and we took part in sample collection,” Sele-Epri said.  

Share Post on

Check Also

ANLCA, MWUN, Others Threaten Shutdown over Port Roads, E-Call Up at Onne

By Paul Williams   Freight forwarders and truckers at Onne Port in Rivers State have threatened to shut down operations over the poor condition of the port’s access roads and the manner in which the e-call-up system recently introduced by the Nigerian Ports Authority (NPA) is being implemented.  Six associations operating at the port, along with the Onne Youths Congress, the umbrella body for youths in Onne Community, noted that despite the huge resources accruing from Onne Port, the access roads leading to the port had become a death trap.  The associations on Wednesday, August 12, 2026, issued a four-day ultimatum to the Federal Government and the Nigerian Ports Authority to suspend the e-call-up system until facilities such as loading bays are provided and dilapidated access roads are repaired.  Chairman of ANLCA, Onne Seaport Chapter, Chief Ifeanyi Isikaku, while reading a communique, expressed the associations’ deep concern and frustration over worsening operating conditions for members and the host community.  The unions said NPA rolled out the e-call-up system without first providing adequate holding bays, prompting “the unabated illegal parking of trucks on Onne roads that has choked traffic, damaged goods and exposed workers and residents to danger.”  They also described the port’s internal access roads as “deplorable” and a “death trap,” blaming the road condition for container-fall incidents, injuries and loss of life.  Isikaku said, “We can no longer tolerate unfulfilled NPA commitments and roads that endanger lives and destroy goods. If holding bays had been provided before the e-call-up rollout, this crisis would have been avoided.”  He pointed out that the situation is unfortunate for a port that has contributed up to N487 billion in Customs revenue alone to the federal coffers.  Isikaku said Customs revenue from Onne Port Command between January and July 2026 was approximately N439 billion, with an additional N48 billion from the Oil and Gas Free Zone — a combined N487 billion over seven months.  He called on the Federal Government, through the Minister of Marine and Blue Economy, to allocate a portion of that revenue to fix and maintain internal roads and port facilities.  “Onne contributes significantly to national revenue; a fraction of the N487 billion collected between January and July should be used to repair our roads and protect workers and the host community,” he said.  The unions, among other things, demanded an immediate end to illegal parking on Onne roads to restore free traffic flow, urgent maintenance and repair of all internal access roads to prevent container falls and safeguard lives, and a ban on members’ participation in arbitrary or bogus payments associated with the e-call-up system and port transport.  Chairman of the Maritime Union of Nigeria, Eastern Port, Uche Ogbu, whose union bears the brunt of the dilapidated roads, said, “Our members will not be compelled to make arbitrary payments for a system that lacks the infrastructure to work.”  He noted the unions’ resolve on the suspension of the e-call-up system from Monday, August 17, 2026, until adequate holding bays are constructed to accommodate current truck volumes; the suspension will remain in place until all listed challenges are addressed.  …

Leave a Reply

Your email address will not be published. Required fields are marked *